| Cold test results discusson |
|
|
|
Fusillo Project |
Meeting |
| Training for using the FDM 3D Printers at IdeaSquare |
|
|
|
Trainings for machine usage (CERN Personnel) |
Conference |
| Alice Weekly Meeting: Software for Hardware Accelerators |
|
|
|
PDP-SRC |
Meeting |
| ATLAS Higgs and DiHiggs Workshop 2025 - Invited talk |
|
|
Ramphal Building |
Physics and Performance Weeks; Workshops |
Meeting |
| NorCC Annual Workshop 2025 |
|
|
|
Common events |
Conference |
| 7th Injection Design Meeting |
|
|
354/1-019 |
Interaction region design |
Meeting |
| DRD1 Gaseous Detectors School 2025 |
|
|
|
DRD1 Gaseous Detector School |
Conference |
| The 11th DIRAC Users' Workshop |
|
|
Multidisciplinary Building 124-125 |
Others |
Conference |
| HFLAV all-hands |
|
|
|
HFLAV |
Meeting |
| ABT - QM workgroup meeting 62 |
|
|
865/2-C19 |
ABT Quality management working group |
Meeting |
| WP1.4. - Timo Peltola - Understanding CV-results of test diodes & MOSCAPs of HGCAL production sensors by TCAD simulations |
|
|
online only meeting |
General WP1.4. Meetings |
Meeting |
| Couplers meeting |
|
|
864/2-B14 |
Coupler collaborations |
Meeting |
| B777 - public information session |
|
|
774/R-013 |
B777 building (public) |
Meeting |
| Atlas O.B. Intermediate support |
|
|
|
Other Meetings |
Meeting |
| FGC interlocking for regulation errors in SPS and North Area |
|
|
864/1-B04 |
HI-ECN3 – EPC |
Meeting |
| 190th EATM Meeting |
|
|
530/R-030 |
EATM General Meetings |
Meeting |
| FCC-ee QCD meeting |
|
|
|
QCD and γγ physics |
Meeting |
| Beam-Beam Meeting |
|
|
6/2-004 |
FCC-ee beam-beam meetings |
Meeting |
| 23rd AWAKE instrumentation meeting |
|
|
864/1-B04 |
CP7: Beam Instrumentation |
Meeting |
| 105th Impedance Working Group meeting (dedicated to SY-BI) |
|
|
866/2-D05 |
Impedance Working Group |
Meeting |